HandyMench installed Pedestal floating flooring for a 650 square-meter building. The floating access floor was installed 60cm above the concrete slab in order to allow for cables and machinery to be placed under the flooring.
HandyMench installed Pedestal floating flooring for a 650 square-meter building. The floating access floor was installed 60cm above the concrete slab in order to allow for cables and machinery to be placed under the flooring.
Based out of Jerusalem our home repair service department services the greater Jerusalem area including Bet Shemesh, Modiin, Gush Etzion, Mevaseret Tzion, Binyamin, and Yehuda.